Improve Time to Market and Cost by
Reducing Engineering Change Orders (ECOs)

Request Demo

DFM considerations during design: Perspective change from Reactive to Proactive

Global competition, increasing product complexities, and pressures to optimize costs have led to an iterative product development process which significantly impacts time to market and product costs. Design engineers spend around 30% or more of their time on engineering rework due to downstream manufacturability and assembly issues.

Identifying and correcting potential downstream issues right at the design stage can save a lot of time and effort and maximize productivity.

Learn from Honeywell Aerospace on how a proactive approach to Design for Manufacturing will help reduce manufacturing cost and improve time to market.

View Webinar Recording


Ready to transform your product design? Request a Demo
Scroll to Top